Posted on: August 20, 2019

Request for Proposals to Construct the Highland Loop Trail

The Town of Cave Creek issues this Request for Proposals for construction of the proposed HIGHLAND LOOP TRAIL- 4 ft wide x ¼ mile trail project. The expected project time for this engagement is expected to be approximately 3-6 months starting perhaps as early as November 2019, with a project completion date to be no later than June 30, 2020. The firm or individual must have the required capabilities and an in-depth understanding and working knowledge of the Town of Cave Creek’s Technical Design Guideline-Number 5 Trails. Click http://www.cavecreek.org/DocumentCenter/View/3016 for document.

The proposed Highland Loop Trail will be located at the east end of the Highland Road right-of-way, just past the 75th Street alignment within the Town of Cave Creek. The proposed trail is approximately 4 ft. wide x ¼ mile crossing over dedicated trail easements on private properties. An aerial of the proposed Highland Loop Trail has been provided to show the approximate route of the proposed neighborhood trail. Exhibit B.

The proposed Highland Loop Trail is identified as a Neighborhood Connector Trail (local trail) as noted in the “Trail Classification – Standards Table” of the Town of Cave Creek’s Technical Design Guidelines-Number 5- Trails. Exhibit A.

The Town will provide surveying, traffic control during the construction period, and the removal of any debris resulting from the construction project. The contractor will work closely with Town Staff to schedule and coordinate timing of traffic control and debris removal.

Competitive proposals for the services specified in this notice will be received by the
Town of Cave Creek at the above specified location until the time and date cited. Proposals must be in the actual possession of the Town of Cave Creek on or prior to the exact time and date indicated above. Late proposals will not be considered. The preparation of the RFP response will be at the expense of the respondent.
Additional Info...
Facebook Twitter Google Plus Email

Other News in Home

Traffic Closures and Restrictions

Posted on: September 11, 2019

Sunshades and Reusable Bags at Town Hall

Posted on: September 4, 2019
town logo

Cave Creek FY20 Budget Summary

Posted on: July 26, 2019
Cave Creek Water Truth graphic

Cave Creek Water Truth

Posted on: July 18, 2019

Public Auction Notice

Posted on: May 11, 2017